True island mode
Off-grid operation reduces dependency on public-grid dynamics and enables controlled delivery planning.
Technology
On-site generation, a central medium-voltage switchgear lineup and defined load zones — delivering capacity that does not depend on the public grid.
Architecture
The facility generates its own power with four CAT G3616 and four CAT G3516 gas engines. Their output is collected on a 13.8 kV, 60 Hz bus and distributed through a central medium-voltage switchgear lineup to defined load zones.
Operating in island mode means the site balances generation and load itself. That removes interconnection queues and grid curtailment from the equation and makes delivered capacity predictable over long contract terms — the property long-duration compute needs most.
Capacity is organized into a baseline zone for steady-state loads, a flex zone for higher-density deployments, and reserve headroom for expansion without overbuild.
Architecture in figures
From natural gas to the load zone: one site, one medium-voltage bus, three planning zones.
Energy flow · simplified one-line view
Fuel
Natural gas
Supplied to the on-site generation plant.
Generation
8 gas engine gensets
Reciprocating prime movers, 60 Hz.
Distribution
13.8 kV bus
Central medium-voltage switchgear lineup.
Load zones
Island mode: no connection to the public grid. Generation and load are balanced on site.
Source: Cottleone site specification · Status: November 2026. Simplified view for orientation; single-line diagrams and operating limits are provided in the data room.
Capacity allocation
Solid: lower boundLighter: planning rangeHatched: reserve
| Zone | Use | Planning range |
|---|---|---|
| Load A | Baseline, steady state | 8–10 MW IT |
| Load B | Flex, higher density, liquid-ready | 6–7 MW IT |
| Reserve | Headroom and expansion | ~1–2 MW |
| Total | Net deliverable (22.41 MVA × 0.80) | 17.93 MW |
Ranges are planning figures, not guaranteed maxima. The combined allocation of all zones never exceeds 17.93 MW net; deliverable IT load depends on workload mix and cooling design.
Source: Cottleone site specification · Status: November 2026.
Why it matters
Infrastructure-first delivery: measurable capacity, metered energy and operational control.
Off-grid operation reduces dependency on public-grid dynamics and enables controlled delivery planning.
Transparent metering supports reliable invoicing and reporting for every stakeholder.
Capacity scales via standard pods, blocks and pads — without redesigning the site each phase.
Defined access, acceptance and maintenance windows protect stability and availability.
A practical path from baseline air cooling to high-density liquid deployments.
Clear access procedures and optional remote hands for predictable multi-tenant operations.
Specification
Public summary. Detailed single-line diagrams and operating limits are provided in the data room.
| Parameter | Value | Note |
|---|---|---|
| Generation | 4× CAT G3616 · 4× CAT G3516 | Gas-fired prime movers |
| Installed capacity | 22.41 MVA | At power factor ~0.80 |
| Net deliverable | 17.93 MW | Class figure |
| Distribution | 13.8 kV, 60 Hz | Central MV switchgear lineup |
| Load A | 8–10 MW IT | Baseline, immersion / air |
| Load B | 6–7 MW IT | Flex, liquid-ready |
| Reserve | ~1–2 MW | Headroom and expansion |
FAQ
Straight answers for deployment planning, procurement and operations.
The site generates and balances its own power without a connection to the public grid. Delivery is therefore not affected by grid curtailment or interconnection queues.
Through multiple prime movers, defined load zones, reserve headroom and governed maintenance windows.
Yes. Capacity is organized in standard blocks, pods and pads so additional phases can be added without redesign.
Single-line diagrams, operating limits and commissioning sequence are shared in the data room after verification.
Explore
One site, one deterministic delivery model, three ways to deploy.