Contracting model

Reserve. Meter. Operate.

A straightforward model built for predictable delivery: reserve capacity, meter energy, operate under clear standards.

kW / MWReservation blocks
kWhMetered billing
PhasedAligned to your rollout
DefinedSite rules & windows

Three steps

One model across every product

Powered Space, Powered Pads and Mining Hosting all follow the same three principles.

Reserve capacity

Capacity is contracted as kW/MW blocks aligned to your deployment phases.

Metered energy delivery

Energy is delivered and billed via metering, providing transparent reporting.

Operational standards

Deployment and access follow defined site rules to protect stability.

Step by step

The contracting path at a glance

Six steps from first request to metered operation — the same path for every product model.

Contracting path

From first request to metered operation

  1. 01
    Request

    You share use case, target MW range and timeline.

    Output: scoping request
  2. 02
    Verification

    We verify the counterparty and the planned deployment.

    Output: data room access
  3. 03
    Data room review

    Interconnect standards, capacity blocks, metering and site rules.

    Output: technical fit
  4. 04
    Capacity reservation

    A kW/MW block is reserved for each rollout phase.

    Output: reservation + commercial terms
  5. 05
    Commissioning

    Interconnect per standard, acceptance checklist, energization.

    Output: accepted load
  6. 06
    Metered operation

    Billing on measured kWh with a fixed reporting cadence.

    Output: invoices + reports

Additional blocks or pads can be reserved for later phases within the available headroom. Durations depend on the product model and are agreed per phase.

Source: Cottleone site specification · Status: November 2026.

In detail

Clarity for procurement, finance and operations

Reservation. You reserve a defined capacity block for each phase of your rollout. The reservation is what makes delivery auditable — there is no best-effort allocation.

Metering. Energy is measured and reported on a consistent cadence. Invoices are based on measured kWh, so every stakeholder works from the same data.

Standards. Access procedures, acceptance checklists and maintenance windows are written down before deployment, not negotiated during it.

FAQ

Questions buyers ask first

Straight answers for deployment planning, procurement and operations.

What do we sign?

A capacity reservation for your phase, combined with metered energy terms and the site standards for your product model.

How does expansion work?

Additional blocks or pads can be reserved as your deployment grows, aligned to phased commissioning and availability.

When do we see pricing?

Commercial structure is shared after verification through the data room and a short scoping call.

Start the reservation process

Tell us your target block and timeline. We reply with availability and the commercial structure.